| Hongkong Electric, Contract No. 04/9022, Supply & Installation of Steel Members for 132kV Overhead Transmission Line (Phase 3) |
| | Supply and Installation of the replacement tower steel members and removal of scrapped steel from site on the nine designated towers. Contract completed in April 2005. |
|
| Hongkong Electric, Contract No. 03/9375, Supply & Installation of Steel Members for 132kV Overhead Transmission Line (Phase 2) |
| | Valued at HK$1 million. Engineer, supply, installation of high tensile galvanized steel angles and plates for towers. Contract completed in April 2004. |
|
| Hongkong Electric, Contract No. 01/9061, Supply & Installation of Steel Members for 132kV Overhead Transmission Line (Phase 1) |
| | Valued at HK$5.1 million. Engineer, supply, installation of high tensile galvanized steel angles and plates for towers. Contract completed in March 2003. |
|
| Hongkong Electric, Contract No. 01/9308, Consultancy Services of 132kV OHL & Tower Refurbishment |
| | Valued at HK$1 million. Engineer, supply, installation of replacement steel members and bolts for towers. Contract completed in November 2001. |
|
| Hongkong Electric, Contract No. 01/9203, 132kV Overhead Line Tower Member Replacement |
| | Valued at HK$1.64 million. Engineer, supply, installation of replacement steel members and bolts for towers. Contract completed in May 2001. |
|
| CLPP 400kV Substation 10 Locations Kowloon |
| | Valued at HK$14 million. Design, supply, manufacture, installation of control cabling testing and commission of 400kV protection equipment. Contract completed in 1996. |
|